Those who do engineering know that projects often encounter the situation of rushing to meet deadlines. For the floor used in outdoor scenes, if the aluminum alloy floor is correctly selected, the construction period of the project will have more flexibility. As a large aluminum alloy outdoor building material manufacturer, Supreme Carl's outdoor aluminum alloy floor has significant advantages. The following is a detailed analysis from five dimensions: material characteristics, construction efficiency, applicability, cost-effectiveness and case support:
1. Material characteristics: the basic guarantee for rapid construction
Modular design: Aluminum alloy floor adopts standardized modules, supports snap-on or lock-on splicing, does not require complex tools, and the installation time of a single piece is only 10-15 seconds, which is 3-5 times more efficient than traditional stone or wooden floors.
Lightweight structure: A single floor is lighter in weight, convenient for manual handling, and does not require mechanical lifting. It can be "installed while transporting" and reduce the connection time of the process.
Maintenance-free characteristics: Aluminum alloy material is corrosion-resistant and mildew-resistant, does not require a waterproof layer or anti-corrosion treatment, and saves pre-construction processes (such as traditional wood needs to be aired and painted with preservatives, etc.).
2. Construction efficiency: the key factor in shortening the construction period
No foundation layer requirement:
According to the ground conditions (such as concrete, asphalt): self-leveling + aluminum alloy floor, the average daily laying area of 2-person team can reach 100-150㎡.
Soft ground (such as grass, sand): laying keels, no foundation hardening is required, and temporary or semi-permanent ground construction is completed within 24 hours.
All-weather construction: Aluminum alloy material is resistant to high temperature (80℃) and low temperature (-40℃), and construction can continue in rainy and snowy weather (pay attention to the drainage slope), which reduces the risk of weather shutdown compared to materials such as tiles.
Reversible installation: supports rapid disassembly and assembly. If the layout needs to be adjusted or temporarily removed, it only takes 5 seconds to disassemble a single floor, which is convenient for later transformation or recycling (Supreme Carl manufacturers support recycling).
3. Applicability: Solutions covering multiple scenarios
Emergency rescue scenarios: such as temporary resettlement sites and emergency medical stations after disasters, aluminum alloy floors can be laid at the level of thousands of square meters within 24 hours, quickly forming a flat and moisture-proof activity space.
Commercial event scenarios: short-term events such as music festivals and exhibitions adopt a rental model, which can be recycled after the event, reducing the cost of traditional wooden floors by more than 40%.
Municipal engineering scenarios: park trails, bus stops, etc., aluminum alloy floors are equipped with hidden drainage grooves, and the construction period is shortened by 300% compared with stone paving, and no later maintenance is required.
4. Cost-effectiveness: balance between short-term investment and long-term value
Short-term cost: comprehensive labor (reduced by 50%), construction period (shortened by about 80%) and maintenance costs (almost zero), the full cycle cost is reduced by about 70%.
Long-term value: The service life is more than 20 years, and the residual value rate can reach 60-70%, which is suitable for projects that require rapid investment and long-term use (such as scenic plank roads and commercial plazas).
5. Case support: feasibility of practical verification
|
|
|
Hangzhou Asian Games temporary stands: using aluminum alloy floors, 30,000 square meters of audience seats were built within a few days, and 90% of the materials were recycled and reused after the game.
Shanghai CIIE outdoor exhibition area: within the 7-day limit, the modular design achieved seamless splicing of the 2,000-square-meter exhibition area, with an average daily paving area of 300 square meters and no quality complaints.
Xiongan New Area temporary office area: under the conditions of frozen soil construction, 5,000 square meters of ground paving was completed within 3 days to ensure the progress of winter construction.